TEBIN

Industries · Data Centers

Engineering design
and BIM delivery for
mission-critical
data centers

Data centers require clear interfaces, reliable systems, coordinated models, and documentation that supports construction and operation. TEBIN supports mission-critical projects with integrated engineering, BIM coordination, and digital delivery across MEP, CSA, controls, telecom, and fire protection disciplines.

Start a conversation →

What we support

Every system.
Every interface.
One coordinated model.

Data center engineering demands technical precision across multiple disciplines working simultaneously. We design and coordinate power, cooling, controls, fire safety, ICT, and CSA systems — keeping every interface documented, every decision traceable, and every deliverable buildable.

Our teams understand redundancy logic, commissioning sequences, and the coordination complexity that comes with Tier-classified infrastructure. We reduce coordination risk before it reaches the construction site.

Tier IITier IIITier IVEdge & ColocationHyperscaleEnterprise

Systems we coordinate

Power

  • MV/LV power distribution
  • UPS systems & batteries
  • Diesel generators
  • Switchgear & PDUs
  • STS & busbar systems
  • Earthing & lightning protection

Cooling

  • Cooling systems & chillers
  • CRAH / CRAC units
  • Fan wall & in-row cooling
  • Liquid cooling & CDU interfaces
  • Precision air conditioning
  • Free cooling & economisers

Controls

  • BMS / EMS / EPMS
  • DCIM integration
  • Controls & automation logic
  • Monitoring & alarm systems
  • Switching sequences
  • Commissioning documentation

Safety & ICT

  • Fire detection & suppression
  • ICT & telecom infrastructure
  • Security & access control
  • Emergency lighting
  • Lighting design
  • External utilities & site infrastructure

BIM & digital delivery

BIM is not just the model.
It is how we control the project.

We use BIM as a project delivery method — not only as a visualisation tool. Our workflows improve coordination quality, reduce design gaps, and make engineering decisions traceable from concept to construction.

01

BIM Strategy & BEP

We define the BIM Execution Plan, information requirements, naming conventions, and coordination workflows aligned to ISO 19650 and project-specific requirements.

02

Model Federation

Discipline models are federated into a single coordination environment. We manage model structure, file naming, and update cycles throughout the project.

03

Clash Detection

Systematic clash detection across MEP, structure, and architecture — with issue tracking, resolution workflows, and sign-off documentation.

04

CDE & Information Management

We coordinate Common Data Environments, manage document workflows, and ensure information quality at every milestone and handover point.

Why project teams choose us

Data center engineering
leaves no space for
unclear interfaces

  • Clear interface management between all disciplines from day one
  • Redundancy and reliability logic built into engineering decisions
  • Coordinated models that reflect real construction constraints
  • Documentation engineered for tender, construction, and commissioning
  • ISO 19650-based BIM workflows for information clarity and traceability
  • Experience with Tier II–IV data center scopes and international delivery

Get in touch

Working on a data center project?
Let's discuss the engineering scope.

Share your project stage, technical challenges, and required disciplines. We will respond from our Szczecin office within one business day.

Start a conversation →

Let's make every
building on Earth digital

International Engineering & Consultancy

Start a project →